This shot shows the construction of the set.
The basic shape was completed in two hours.
The stairs, and the decoration, took weeks.
We added a sawdust/glue stucco to the arches to give them texture. We were a little heavy handed with the stucco, but the result looks great.
Here the cast practices on the half-built set.
Rehearsal Shot
The Dance
This shot shows the crew on the set.